10 Questions You Should to Know about Bop Ram
BOP - Test Your Well Control Knowledge for Free
Tag Archives: BOP
Closing Units – Surface Installations Quiz
BOP Closing Unit
Time limit: 0Quiz-summary
0 of 20 questions completed
With competitive price and timely delivery, Yulin Machinery sincerely hope to be your supplier and partner.
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
Information
BOP closing unit is one of the well control equipment and it is very critical for the operation because it provides power to operate all the BOP rams. Personnel need to fully understand its functions, how to maintain and test it. Therefore, this quiz will focus on the closing unit of surface installations. There are a total of 20 questions in this quiz which will help you learn and refresh your knowledge about this topic. Please feel free to drop and comments or questions in this post and we will answers your questions as much as we can. Enjoy the test.
Quiz is loading...
Results
0 of 20 questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 points, (0)
Average score Your scoreCategories
- Not categorized 0%
-
Congratulations!
You have completed the test.
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- Answered
- Review
-
Question 1 of 20
1. Question
What is Blowout preventer (BOP) control system?
- It is a high pressure hydraulic power unit fitted with directional control valves to safely control kicks and prevent blowouts during drilling operations.
- It is a system which helps control bottom pressures
- It is a low pressure hydraulic power unit
Incorrect
-
Question 2 of 20
2. Question
What are the two types of accumulators available and in which sizes are they available?
- Fat and thin types with square and octagon sizes
- Bladder and Float types with cylindrical or ball styles
- Hallow and swallow types with triangular and hexagon shapes
Incorrect
-
Question 3 of 20
3. Question
The following are the component of surface BOP control system, except:
- Reservoir, Accumulator piping
- Air pump assembly, Electric pump assembly
- Standpipe manifold
Incorrect
-
Question 4 of 20
4. Question
Which one of the following is in-correct statement about electric pump assembly?
- It is connected to the reservoir to provide high pressure operating fluid for BOP control system.
- It is available in a variety of horsepower and voltage ranges.
- It consists of a duplex or triplex reciprocating plunger type pump driven by an explosion-proof electric motor.
Incorrect
-
Question 5 of 20
5. Question
What are accumulator bottles?
- They are containers which store compressed hydrogen gas.
- They are containers which store hydraulic fluid under pressure for effectively and quickly closing the BOP.
- They are containers which accumulate mud pits.
Incorrect
-
Question 6 of 20
6. Question
6. The electric pump assembly consists of a duplex or triplex reciprocating plunger type which is driven by _____. What is the correct word in the blank?
- An explosion proof electric motor
- A non-explosion proof electric motor
- A hydraulic accumulator unit
Incorrect
-
Question 7 of 20
7. Question
What are the positions of 4-way valve?
- Normal, left and right
- Precharge and fully charge
- Open, close and block
Incorrect
-
Question 8 of 20
8. Question
When will you put the 4-way valve in “block” position?
- Rig move and rig repair
- While drilling
- While logging
Incorrect
-
Question 9 of 20
9. Question
Which one is the wrong statement about response time to close ram preventer?
- The closing unit should be able to close each ram preventer within 30 seconds.
- Closing time should not exceed 30 seconds for annular preventers smaller than 18 ¾ inches and 45 seconds for annular preventers 18 ¾ inches and larger.
- Closing time should not exceed 45 seconds for annular preventers smaller than 18 ¾ inches and 60 seconds for annular preventers 18 ¾ inches and larger.
Incorrect
-
Question 10 of 20
10. Question
Which statement is correct about operating pressure and precharge requirements for accumulators?
- The precharge pressure on each accumulator bottole should be measured during the initial closing unit installation on each well and adjusted if necessary.
- Nitrogen gas should not be used for accumulator precharge.
- The precharge pressure may not be checked frequently during well drilling operations.
Incorrect
-
Question 11 of 20
11. Question
Please fill in the blank:
The minimum recommended accumulator volume (nitrogen plus fluid) should be determined by _________ the accumulator size factor times the calculated volume to close the annular preventer and one pipe ram plus the volume to open the hydraulic choke line valve.
- Adding
- Multiplying
- Subtracting
Incorrect
-
Question 12 of 20
12. Question
Fill in the blank:
As per the pump pressure rating requirement, each closing unit must be equipped with pumps that will provide a ______ pressure equivalent to the rated working pressure of the closing unit.
- Discharge
- Rating
- Casing
Incorrect
-
Question 13 of 20
13. Question
Which one is not the correct statement regarding pump power requirement?
- Power for closing unit pumps must be available to the accumulator at all times such that the pumps will automatically start when the closing unit manifold pressure has decreased to less than 90 % of the accumulator operating pressure.
- Two or three independent sources of power should be available on each closing unit.
- A dual air and electrical system is not recommended at any time.
Incorrect
-
Question 14 of 20
14. Question
How often do personnel need to do function test on all operation BOP equipment?
- At least once a week
- Every 21 days
- Every month
Incorrect
-
Question 15 of 20
15. Question
What is the correct requirement about valves and fittings for closing unit?
- All valves and fittings between the closing unit and BOP stack can be made of plastic.
- All valves and fittings between the closing unit and the BOP stack should be of steel construction with a rated pressure at least equal to the working pressure rating of the BOP stack up to psi.
- All valves and fittings between the closing unit and the BOP stack should be of steel construction with a rated pressure at least equal to the working pressure rating of the BOP stack up to 1,500 psi.
Incorrect
-
Question 16 of 20
16. Question
The closing unit control valves must be clearly marked to indicate two things. Which one is NOT correct?
- Which preventer or choke line valve each control valve operates
- The position of the valves i.e. open, closed or neutral
- Pressure rating of the valve
Incorrect
-
Question 17 of 20
17. Question
Which fluid is suitable as closing unit control operating fluid from the following?
- Hydraulic oil or fresh water containing a lubricant
- Diesel oil or Kerosene
- Motor oil
Incorrect
-
Question 18 of 20
18. Question
What important precaution shall be taken prior to conducting any closing unit pump capability tests?
- Make sure that closing unit reservoir contains drilling fluid
- Make sure that the closing unit reservoir should be inspected to ensure it does not contain any drilling fluid, foreign fluid, rocks or other debris
- Make sure that closing unit reservoir contains debris or rocks
Incorrect
-
Question 19 of 20
19. Question
What is the minimum required capacity of the reservoir tank?
- 1 time the capacity of the usable fluid capacity
- 1.5 times the capacity of the usable fluid capacity
- 2 times the capacity of the usable fluid capacity
Incorrect
-
Question 20 of 20
20. Question
During accumulator closing test, how much should be final accumulator pressure i.e. closing unit pressure?
- It should be at least 200 psi above the precharge pressure.
- It should be at least 500 psi above the precharge pressure.
- It should be at least 700 psi above the precharge pressure
Incorrect
Leaderboard: BOP Closing Unit
maximum of 20 points Pos. Name Entered on Points Result Table is loading No data available Tagged BOP, Closing, control, Unit, wellComponent of Hydril GL Annular BOP Quiz
Component of Hydril GL Annular BOP Quiz
Time limit: 0Quiz-summary
0 of 9 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
Information
Annular preventer is one of the most critical well control equipment on the rig; therefore, it is very important that personnel in drilling operation should understand about it and know its components. This quiz is based on Hydril GL Annular BOP which is commonly used on the rigs around the world. In this quiz, there are a total of 9 questions and each question points to a specific component. You need to select the right answer from three choices. Each question has answer which will help you learn if you select the incorrect answer and you will see your final score at the end of the quiz.
We wish you would enjoy doing the Hydril GL Annular BOP Component quiz.
You have already completed the quiz before. Hence you can not start it again.
For more information, please visit Bop Ram.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 9 questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 points, (0)
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- Answered
- Review
-
Question 1 of 9
1. Question
What is the component No.1?
- Piston indicator hole
- Wear plate
- Packing unit
It is a piston indicator hole.
Incorrect
It is a piston indicator hole.
-
Question 2 of 9
2. Question
What is the component No.2?
- Latched head
- Opening chamber head
- Wear plate
It is a wear plate.
Incorrect
It is a wear plate.
-
Question 3 of 9
3. Question
What is the component No.3?
- Closing chamber
- Packing unit
- Secondary chamber
It is a packing unit.
Incorrect
It is a packing unit.
-
Question 4 of 9
4. Question
What is the component No.4?
- Latched head
- Opening chamber head
- Opening chamber
It is a latched head.
Incorrect
It is a latched head.
-
Question 5 of 9
5. Question
What is the component No.5?
- Closing chamber
- Opening chamber head
- Secondary chamber
It is a opening chamber head.
Incorrect
It is a opening chamber head.
-
Question 6 of 9
6. Question
What is the component No.6?
- Piston indicator hole
- Wear plate
- Opening chamber
It is an opening chamber.
Incorrect
It is an opening chamber.
-
Question 7 of 9
7. Question
What is the component No.7?
- Opening chamber
- Piston
- Closing chamber
It is a piston.
Incorrect
It is a piston.
-
Question 8 of 9
8. Question
What is the component No.8?
- Closing chamber
- Wear plate
- Packing unit
It is a closing chamber.
Incorrect
It is a closing chamber.
-
Question 9 of 9
9. Question
What is the component No.9?
- Opening chamber
- Closing chamber
- Secondary chamber
It is a secondary chamber.
Incorrect
It is a secondary chamber.
Leaderboard: Component of Hydril GL Annular BOP Quiz
maximum of 9 points Pos. Name Entered on Points Result Table is loading No data available Tagged BOP, Hydril GL Annular, Well Control QuizBOP Inspection and Testing - PDH Quiz
The division inspector must verify that all of the requirements for casing, BOPE, hole-fluid monitoring equipment, and pressure rating are satisfied. True False 6. In most cases, BOPE tests are conducted prior to drilling below the casing shoe or kick-off point (KOP). In situations where the casing is open to the formation, a sealing device (either cement or mechanical) must be placed as close as practical to the shoe or KOP (whichever is higher) so that the casing’s mechanical integrity can be determined. The anchor casing string, to which the BOP stack is attached, is an integral part of the BOPE and must be tested, either separately or in conjunction with the BOP stack. True False 7. When we are pressure testing blowout prevention equipment, all components of the BOP stack, kill- and choke-line valves, workingstring safety valve, internal preventer, kelly cock(s), and standpipe valve must be tested in the direction of blowout flow. Clean water should be used as the test fluid, especially in critical areas. True False 8. When selecting a suitable test pressure for the BOPE and anchor casing string, two factors need to be considered: the Maximum Predicted Casing Pressure (MPCP) for the well, and the Minimum Internal Yield Pressure (MIYP) of the anchor casing string. When testing casing in conjunction with the BOPE, the maximum pressure applied to the shoe of the anchor string (or KOP) must not exceed 125 percent of the MPCP or 80 percent of the MIYP, whichever is lower. True False 9. The following is the procedure for testing of :
The Kill-line Control Valve (Figure 27-4d)
- Close the kill line control valve.
- Rebuild the test pressure through the drill pipe, checking the pressure on the pump pressure gauge, the choke-manifold pressure gauge, and/ or the standpipe pressure gauge.
- Close the standpipe valve.
- Bleed the pressure at the pump.
- Open the kill-line high-pressure access valve. If the system does not include this valve, it will be necessary to dismantle the check valve to check the kill-line master valve and the kill-line control valve in the direction of blowout flow.
- If there is pressure loss, check the opening at the kill-line high-pressure access valve or look into the check valve to see if the kill line control valve is leaking.
Subsea Preventer Actuation Testing. In addition to the pressure testing just outlined, each of the preventers in the subsea stack must be actuated according to the following schedule:
If you are looking for more details, kindly visit Wellhead Pressure Control Equipment.
- Each of the pipe-ram preventers must be tested for actuation before pulling drill pipe out of the hole on each trip, or at least once each 24 hours.
- The annular preventers need not be actuated during this pretrip function testing as long as they are being operated during the required weekly pressure tests or at an interval not greater than once each seven days.
- Periodic actuation-testing is not required for the blind or blind-shear rams. These rams need only be tested when installed and prior to drilling out after each casing string has been set.
Comments